Every gallon counts in Guymon, and a data center builder has to design cooling with that fact in mind from the first sketch. The city draws its water from the Ogallala Aquifer, and KGOU reported in July 2024 that the aquifer's levels have been dropping and that on one day the city pumped 5.4 million gallons, about 92 percent of its pumping capacity. We build mission-critical shells, generator yards and cooling plants for the Oklahoma Panhandle with that constraint at the front of the design, because a data hall that cannot get water cannot run.
In practice, water-scarce siting favors closed-loop and air-cooled systems, dry coolers and designs that use water only for peak conditions or not at all. Our liquid cooling infrastructure coordination work helps owners and their engineers decide where piping, pumps and heat exchangers sit so that a closed loop is possible without making the building harder to maintain.
The rest of this page covers what we would build in the Panhandle, how we handle the water question, and the practical points of working in a region that sits a long way from the state's metro areas.
Investigate Midwest reported in June 2024 that water levels in the Panhandle's Ogallala Aquifer have dropped 23 percent since a large pork plant opened in 1995. KOSU reported in September 2025 that Guymon leased rights to 640 acres of water for its Mesa Water Project through 2080, with first water expected in October 2026. That new supply may help, but it is a municipal supply for a city, and a large data center would need its own agreement and its own review.
We therefore tell owners to treat water as a permit and an agreement before treating it as a utility. Our cooling water supply and reuse lines scope covers piping, storage tanks and reuse systems, and our preconstruction team asks early for the city's capacity statement, the state water board's permit requirements and the likely cost to connect.
A May 2024 Southwest Ledger report says more than 21,500 animals are processed daily at the pork processing plant in Guymon, which covers about one million square feet, and that more than 2,400 people work there (2022 figures), making its owner the largest employer in the county. We cite these only to show scale: Guymon already hosts a very large industrial facility, with heavy truck movement, large utility loads and a trained maintenance workforce.
A data center in the same market competes for those workers and for the same electrical and water capacity. We approach it by being candid about demand on both and by designing the building to be as efficient as possible, so the owner and the city can see that the project does not take what the plant needs. Utilities and power developers working in the Panhandle, whom we cover on our utilities and power developers page, face the same question of shared capacity, and we coordinate with them on the timing of any new feeder.
Guymon is reached by US-54, US-64, US-412, SH-3 and SH-136, per Wikipedia, and rail freight is available from the Union Pacific Railroad. The Panhandle is far from the state's suppliers, so we plan material deliveries around distance: concrete batch plant capacity, reinforcing steel, precast panels and aggregate may all travel a long way, and we confirm supply before we commit to a pour date.
The upside of the region is space. Large parcels allow generous laydown, separated construction traffic and easy buffer zones around generator yards. We take advantage of it by staging the site with one entrance for deliveries and one for workers, and we use our fast-track scheduling approach to overlap utility work, foundations and wall erection where the weather allows.
The Panhandle is dry and often windy, which affects concrete placement. We plan pours for cooler hours, use wind breaks and curing compounds, and monitor evaporation rates so that a mission-critical slab does not craze or curl. For equipment pads and generator slabs we use a reinforcing layout that tolerates temperature swings and heavy loads.
We manage the footings, slabs, tilt-wall panels and exterior paving with the same standards used elsewhere in the state. For owners considering a modular approach, our modular and prefabricated data halls page explains how prefabricated units can reduce the amount of on-site work in a remote region, with our team coordinating pads, utilities and connections.
Open ground means exposure. Crews on a Panhandle site face wind, heat in summer and cold in winter, and a long drive to the nearest specialist if something goes wrong. We write an emergency plan with the nearest hospital and fire district, hold toolbox talks on heat illness and cold stress, supply shade, water and warming shelters, and keep a medical responder on large pours and major lifts.
We also control dust and runoff. A bare construction site in a dry, windy region can generate dust that drifts into neighboring property, and a heavy rain can wash silt into a draw. Our stormwater and detention scope puts in silt fence, stabilized entrances and temporary basins early, then convert them to permanent detention as the site is finished, which keeps the project in compliance with its stormwater plan and the owner out of trouble.
KGOU reported in July 2024 that a $50 million federal grant will go to Guymon Public Schools for a workforce development center and a new junior high school. A local workforce center is a long-term asset for any operator, since maintenance technicians and electricians can be trained near the facility. We encourage owners to engage with the school district and trade programs as construction begins.
For owners comparing the Panhandle with options farther east, Woodward and Enid offer shorter supply lines, while Guymon offers open land and distance from the metro. The right choice depends on latency needs and on the utility. Latency-sensitive workloads belong closer to users, while batch or archive workloads can tolerate distance, and we are glad to help an owner think through that tradeoff with the engineers.
Tell us the cooling approach, the water source you expect and your power need. We will return a layout and a list of agreements to confirm before design.
Yes, if it is designed for it. Closed-loop, air-cooled and dry-cooler systems use little or no water for heat rejection, though they can use more power. The owner and engineer should decide the cooling strategy before the site layout is final.
It is a municipal project that expected first water in October 2026, and its capacity is planned for the city. A data center would need to ask the city whether supply and a service agreement are available.
Distance adds to freight, crew travel and sometimes to material availability. Large parcels reduce some site costs. We price both and show the difference.
Union Pacific serves the city. Rail can help with heavy equipment, but a spur depends on the parcel and the railroad. We study it in feasibility.
Wind limits crane work, panel lifts and concrete finishing. We set wind thresholds with the crane operator and the engineer, and stop work when the limits are exceeded.

Tell us about the site, the power and cooling plan and the schedule, and we will set up a review of scope, schedule, permits and inspections.