Hardening a building against a tornado is a construction problem with known tools, and Moore is where Oklahoma owners tend to ask for those tools by name. We build data center shells, electrical rooms and generator yards for operators who want envelope strength, protected equipment and a clear storm-day procedure written into the project instead of added at the end. That means precast or tilt-wall panels with continuous load paths, roof edge details sized to the engineer's wind criteria, and exterior equipment arranged so that a failure of one item does not take out the rest.
The city has three well-documented tornado events in its recent past: the May 3, 1999 Bridge Creek-Moore F5, the May 8, 2003 F4 and the May 20, 2013 EF-5, which the National Weather Service rated on a path of about 14 miles. Owners here do not need to be convinced about the risk. What they need is a builder who can turn it into a priced, scheduled scope.
A storm-conscious scope starts with the structure. Foundations and slab are designed for uplift and sliding as well as bearing, wall panels are connected to the roof diaphragm with continuous reinforcement, and openings are minimized and protected. Louvers and air intakes are the hard part, because the cooling and generator systems must breathe while the envelope resists wind-borne debris. We work with the mechanical engineer on impact-resistant louvers and baffled intakes and we price alternatives so the owner can compare.
The scope also includes what sits outside the walls. Generator enclosures, fuel tanks, chiller pads and switchyard equipment each get a restraint plan, and we avoid placing loose material, such as spare pallets or gravel, where wind can use it. For site-specific guidance on the electrical side, our generator and fuel yard work shows how we arrange tanks, pads and barriers.
In March 2014, the Moore City Council approved residential building codes requiring new homes to withstand winds up to 135 miles per hour, with hurricane straps, foundation ties, continuous plywood bracing and high-wind garage doors, and officials at the time believed Moore was the first city in the nation to do so. Those rules apply to houses, not commercial buildings, but they signal how the building department thinks. Reviewers here are used to asking about load paths and connections, and a commercial data center set that shows its wind design clearly tends to move more smoothly.
We prepare permit sets with the structural wind criteria on the cover sheet, and we confirm with the city which commercial editions apply at the date of application. Statewide, the Uniform Building Code Commission adopted newer International Codes, so that confirmation is not a formality. For the electrical gear that fills most of a data center, the state-adopted NEC applies statewide, subject to local adoption.
On June 24, 2026, the Oklahoma Department of Commerce announced that a pharmaceutical distributor selected the North Moore Industrial Park for a 330,000-square-foot regional distribution facility with $179 million in total capital investment and more than 200 direct jobs. A cold-chain distribution center runs inventory, temperature monitoring and order systems that cannot go down, and that kind of occupant is also a plausible tenant for nearby edge or enterprise computing space. It also shows that outside investors are comfortable building critical facilities in Moore despite the weather.
For that kind of customer, we offer the same capability as for pure data center owners. Colocation and wholesale operators can look at Moore as a southern-metro option on I-35, and our Norman and Oklahoma City pages describe how the same corridor works to the south and north.
The new Southwest 34th Street bridge over I-35 took from August 2018 to November 21, 2019 to build, a good reminder that Moore's interchanges are real constraints on delivery routes. We map oversize equipment paths, bridge clearances and turning radii early, and we plan crane picks for the quieter parts of the day. Concrete trucks for slab pours follow a fixed route and have a backup plant on call.
When severe weather is forecast, the pour calendar changes. We do not start a large slab placement if a warning window might interrupt finishing and curing, and we have a pre-agreed list of tasks, such as formwork, rebar tying and underground conduit, that can shift forward when the weather turns a day unusable. That keeps crews productive and protects quality.
The first page of our Moore site safety plan names the shelter location, the warning source we monitor, the stop-work threshold and the person who calls it. We brief every new worker on it. Crew size and vehicle locations are logged each morning so we can account for everyone quickly. After a warning ends, a competent person walks the site for damage to shoring, bracing, scaffolding and temporary power before any work resumes.
Permanent structures get the same attention in a different form. Uncured walls, unsheathed roofs and unbraced panels are the most vulnerable stage of construction, so we sequence bracing and roof closure to reduce the time any large surface stands unprotected. Our tilt-wall and precast shell scope has panels braced to the engineer's erection plan and document the removal sequence.
Most Moore owners pair the shell with site and utility scopes under one contract. Mass grading and site development sets the pad above the drainage path, and stormwater and detention keeps hardened roofs and paved yards from sending water toward a neighbor. We also build the central utility plant pad and its protective walls with the shell, so that cooling equipment and the data hall are tested together.
Keeping these scopes together has a schedule benefit. The same superintendent who knows the slab pour calendar also knows when the duct bank trench will be open and when the chiller pad can be cured and loaded. It also gives the owner one point of contact when weather forces a change, rather than three subcontractors each explaining their own delay.
Give us the parcel and the level of protection you want. We will price the wind criteria, the equipment yard and the delivery plan so the choices are clear.
It can be built to the wind and debris criteria that your engineer and insurer choose, using mass walls, strong roof connections, protected openings and restrained equipment. Absolute guarantees are not realistic, so the useful conversation is about which parts of the facility need the highest level of protection.
No, the 2014 ordinance covers new homes, with a 135 mile per hour design wind, straps, foundation ties and bracing. It still tells us the city is wind-aware, and commercial reviewers will expect a clear wind design on our drawings.
We follow a written storm plan with a stop-work threshold, shelter locations and a post-storm inspection. Large slab pours and panel erections are scheduled to avoid forecast risk windows when possible.
It can be, because of I-35 access and its position just south of Oklahoma City. The decision depends on utility capacity, fiber routes and the owner's risk tolerance. We help compare Moore sites with parcels elsewhere on the corridor.
The new 34th Street bridge opened in November 2019 and changes local access patterns. We map each delivery route and confirm clearances rather than assuming an older route still works.

Tell us about the site, the power and cooling plan and the schedule, and we will set up a review of scope, schedule, permits and inspections.