A data center's cooling plant is a water decision before it is a mechanical one, and in Piedmont that is where we start with an owner. How many gallons per minute can the water system deliver at peak, what does the sewer accept, and where does the plant reject heat? Those answers decide whether a site suits evaporative towers, dry coolers or a closed liquid loop, and they decide the size of the yard around them.
We build cooling and mechanical yards for enterprise and edge facilities, and for developers who want a powered, water-served pad that an operator can finish. The work covers the pads, the supply and return piping, the pump rooms, the drainage and the electrical feeds for the equipment.
Piedmont is a good example of why this matters. It is a growing Canadian County community, and growth competes for the same pipes, power lines and roads that a mechanical yard needs. Our job is to find out early what is left over for a mission-critical load, and to say plainly when the answer is not enough.
We begin a Piedmont cooling study with the water provider and the electric utility, not with a drawing. We ask for the pressure and flow at the nearest main, the planned system improvements, the discharge limits and the date a new connection could be made. Those answers go into a one-page summary that the owner can use with a lender or an operator.
Along the way we record what we do not know, such as a pending rate case or an unfunded main extension, and we say who can resolve it. Owners tell us they value that list as much as the layout.
Then we lay out the yard. Chillers or dry coolers need clearance for airflow and for service cranes, pumps need maintenance access, and tanks need containment. We keep the layout compatible with a central utility plant so the owner can add capacity in phases without rebuilding what is already there.
Piedmont fills 44.1 square miles at the northeast end of Canadian County. Yukon is 10 miles south, and Oklahoma City adjoins the community on that same southern side. That span includes open parcels on the outskirts and developed streets closer to the metro, and the two behave differently. Open parcels give room for a large yard and a long supply line. Infill parcels give shorter utility runs but tighter setbacks and closer neighbors.
Noise and appearance matter in either case. We discuss sound-attenuated fans, screening walls and landscaping with the owner before we price the yard, and we handle surface water through stormwater and detention design so that wash-down and rain do not reach the neighbors.
Piedmont Public Schools has asked voters for money twice in recent years. A $35.7 million bond vote planned for February 11, 2020 covered joining the two middle school buildings, more classrooms, a gym, plus a band room, a safe room certified by FEMA and a basketball arena at the high school. A $114 million bond issue went to voters on April 2, 2024, split between school buildings and buses, with the district citing growth. Enrollment stood at 4,823 across seven district facilities in the 2021 to 2022 school year.
None of that is data center demand, but it shows a community adding households, and households add load to water, sewer and electric systems. An owner who plans a mechanical yard here should assume the utility is also planning upgrades, and should ask where a large industrial customer fits in that queue.
Compared with Yukon to the south, where highway fiber and truck access carry the argument, Piedmont is more often a conversation about land and utilities. Compared with Edmond, it offers larger parcels at the edge of the metro. Real estate developers and site owners who hold land here usually ask us to document those trade-offs for a prospective operator, and we do that with the water, power and road facts in hand.
The city reviews site plans, drainage and building permits, and the county and state agencies review road access, septic or sewer connections and any discharge. A cooling plant brings a few extra items: fuel storage for any generators, chemical storage for water treatment, and noise and lighting rules at the property line.
We list every approval in a single register with the agency, the submission date and the expected review time. Utility agreements usually run longest, so our permitting and utility interconnection work starts them first. We also put the cooling water agreement in writing before the yard design is released, and we confirm how the cooling water supply and reuse lines will connect.
A mechanical yard is built in a fixed order: underground piping and electrical duct, equipment pads, setting of chillers and pumps, piping and insulation, controls, then flushing and testing. We schedule each step with the commissioning plan in mind, so the owner's operations staff can witness tests as systems become ready instead of waiting for a single, crowded final week.
Turnover is where this pays off. Our integrated systems commissioning coordination brings the cooling, electrical and controls testing together, and it produces a closeout set with test results, as-built drawings and maintenance data that the operator can use on day one. Equipment is ordered at the start, since chillers and switchgear set the end date.
Send us the parcel and the load. We will contact the water and electric providers, sketch the yard and give you a realistic timeline for turnover.
The pressure and flow at the nearest main, the planned improvements, the sewer capacity and discharge rules, and the date a new service could be connected. We gather these from the provider and write them into the site summary before design begins.
Yes, dry coolers and closed loops use far less water than evaporative towers, though they use more electricity and need more space. The right choice depends on utility rates, water availability and the owner's efficiency target, and we price options side by side.
We choose fan types and speeds with the neighbors in mind, then add screening and distance. Sound limits are checked at the property line during design and again during commissioning, when every fan runs at its design speed with the doors closed, so the measurement reflects real operation and not a quiet test day. If a reading exceeds the limit, the equipment supplier and the designer adjust speeds or add screening before turnover.
Test reports, as-built drawings, equipment manuals, warranty data and a training session for the operator. We build the closeout set during construction so it is ready when the last test is signed.
Yes. Pre-application meetings save time on drainage, access and utility questions, and we bring the designer and the owner so decisions are made once.

Tell us about the site, the power and cooling plan and the schedule, and we will set up a review of scope, schedule, permits and inspections.