Small data centers deserve the same discipline as large ones, and Bartlesville is a place where a modest, well-built facility makes sense. Our work there is about enterprise and edge buildings in the tens of thousands of square feet: a hardened shell, a real generator yard, a clean electrical service and a design that survives the region's weather. Owners who need a recovery site, a branch compute room or a carrier node outside a major metro are our audience in Bartlesville's county.
The city has begun preparing industrial ground for exactly this scale of building. On March 5, 2025 the City of Bartlesville reported that 15 acres at the Bartlesville Industrial Park were transferred to the Bartlesville Development Authority, split into three five-acre parcels, for a 20,000-square-foot speculative building, with up to 80,000 square feet of industrial space possible. A parcel of five acres is a workable size for a small mission-critical building and its yard.
We talk plainly with owners about what the town can and cannot offer, because small markets reward careful diligence on power, fiber, weather and flood.
At this size, the fixed costs of a mission-critical building weigh heavily. A generator, a switchgear lineup, a cooling plant and a fire protection system cost most of what they would on a bigger project, but are spread over fewer racks. We help owners decide which redundancy level is worth paying for, and we show the price of each step: single-feed with a generator, dual-feed, N+1 cooling, or full concurrent maintainability.
Site conditions come next. Bartlesville's weather and rivers add design cost for envelope strength and drainage, which we cover below. The third driver is utility timing: a service upgrade can cost more than the building shell, and a small owner needs the figure early. Our preconstruction and estimating work puts those three items in front of an owner before any design contract is signed.
KTUL reported on March 3, 2021 that a large energy company has roughly 1,700 employees in Bartlesville. Large employers like that fit the profile we describe for enterprise and financial institutions: they run internal systems, and companies that size often keep some compute close to their campus for latency, resilience or control. We do not claim any work for them. The point for an owner is that the town has a base of technical employees and companies that depend on dependable information systems.
Wikipedia reports that US-75 is the primary north-south route, US-60 the primary east-west route, and that SH-123 also serves the city. The city-owned Bartlesville Municipal Airport has one concrete runway, 17/35, measuring 6,850 by 100 feet. Those facts help with logistics: heavy loads reach town on a few identifiable routes, and a runway of that length supports visits by owners and specialists. Tulsa is about 45 miles south, which makes a second site in the metro a logical pairing for disaster recovery.
The most common request is an enterprise data center, a building with one or two halls, an operations room and a small support area. Next comes the edge data center, which may be only a few thousand square feet but needs the same utility and fiber diversity as a larger building. A prefabricated option, described under modular data center, can shorten the schedule when the owner has a standard design.
A speculative industrial building of the size the city describes can sometimes be converted, but conversion is not automatic. Clear height, floor loading, roof capacity and electrical service all have to be reviewed. We prepare a conversion estimate and compare it with a purpose-built shell so the owner can decide on facts.
Wikipedia reports that an EF4 tornado struck Bartlesville and Barnsdall on May 6, 2024, and that recovery was still ongoing as of July 2024. It also reports that the Caney River flooded in October 1986, splitting Bartlesville in half for several days, and flooded again in June 2007, cresting five feet below the 1986 level. Any owner in this market should expect the design team to address both hazards in the first meeting.
For wind, we use tilt-wall or reinforced masonry shells with a stiff roof diaphragm, engineered tie-downs for rooftop equipment and enclosures rated for the generator yard. For water, we review floodplain maps for each parcel, set electrical rooms and generator pads above the surrounding grade and design detention so that drainage does not rely on a single outlet. Access is part of resilience: if floodwater cuts a road, we want a second route for fuel delivery.
Small sites are tight. Trucks, cranes and trenches share limited space, and a small mistake can disable the only access road. We plan the site logistics before mobilization, mark pedestrian and vehicle zones, and hold daily coordination meetings. Open excavations next to existing industrial neighbors get barricades and signage.
Cleanliness matters for equipment later. Our standards for construction cleanliness and safety keep dust and moisture out of electrical rooms and prevent contamination of cable and equipment. The final cleaning and inspection before energization is documented, so the operator takes over a facility that is ready for load.
We manage the slab, the equipment pads and the underground work on small projects, which keeps coordination simple. A short, compact site is well suited to a single schedule because the pad, the conduits and the backfill can be finished before the equipment arrives. Our slab practice is covered under mission-critical concrete slabs.
Licensed electrical and mechanical partners handle the trades the state requires them to hold licenses for. Oklahoma does not license general contractors, but the Construction Industries Board does require trade licenses for electrical, mechanical, plumbing and roofing work. We check licenses before award and coordinate inspections with the city. For owners also considering the Tulsa metro, our Owasso page describes a nearer suburban option.
Tell us the load, the resilience target and the parcel. We will review utilities, flood and wind exposure and permits and give you a clear written recommendation.
Not for an enterprise or edge facility. The city has prepared five-acre parcels for a 20,000-square-foot speculative building, which is a suitable footprint for a small mission-critical building and yard. The deciding items are power capacity, fiber diversity and the owner's resilience target.
We review current floodplain mapping for the parcel and place critical equipment above the surrounding grade. Wikipedia reports that the Caney River flooded in 1986 and again in 2007, so we also plan for a second access route and for drainage that does not depend on a single outlet.
It depends on the target. An EF4 tornado struck Bartlesville and Barnsdall on May 6, 2024 according to Wikipedia, so owners often ask for more than the minimum. We price the baseline code design and then itemize upgrades such as heavier roof attachment, stronger panel connections and protected generator enclosures.
Sometimes. We check clear height, slab thickness, roof load capacity and electrical service, then compare the conversion cost with a new shell. A building that was designed for light industrial use often needs significant structural and electrical changes.
It follows the cost of downtime. A recovery site may accept a single-feed design with a generator, while a production site may need dual feeds and N+1 cooling. We show the cost of each level so the decision is made with numbers.

Tell us about the site, the power and cooling plan and the schedule, and we will set up a review of scope, schedule, permits and inspections.
Request a Project Review