Data Center Construction in Shawnee, Oklahoma

A 15-acre industrial pad with a rail spur on one edge and a four-lane state highway on the other is close to what a mid-sized data center wants, and Shawnee has one. The Oklahoma Department of Commerce's Shawnee prospectus describes a 15-acre site at 41401 Wolverine Road, 3 miles north of I-40, bordered on its east end by a BNSF rail spur and zoned for medium industrial use. We use sites like that as a starting point for enterprise and edge builds in Pottawatomie County.

Acreage is only part of the picture. A data center on 15 acres needs room for a building, a generator yard, a cooling plant, an electrical yard and truck access, with setbacks from the property line that the zoning or the owner's security plan may require. We lay those pieces on the actual parcel and tell the owner what fits, how many halls are realistic and where an expansion would go.

The rest of this page describes how we handle that work, what Shawnee's institutions add, and which questions to answer before buying land.

Fitting a campus on fifteen acres

We begin with a block plan. The building sits where the soil is best and the access is simplest. The generator yard sits downwind of any office or visitor area and close to the fuel delivery route. The cooling plant goes where airflow is clear and noise reaches the fewest neighbors. The electrical yard goes near the utility entrance so that duct banks stay short. Sketching these in order of difficulty keeps the layout honest.

Then we price the work: the earthwork, the building shell, the yards, the underground utilities and the fencing. The shell follows our approach to data center shell and core. The yards follow our practice for generator yards and fuel systems. An owner receives a budget range and a schedule with the main assumptions listed.

Working with the city and the tribal nation

News 9 reported on September 28, 2021 that the Citizen Potawatomi Nation and the City of Shawnee signed the Shawnee Aligned agreement, pooling resources for public facilities, fire and police protection, and economic development. Cooperation of that kind matters to a builder because the city, the nation and the county all influence roads, utilities, emergency response and permitting. We meet the relevant parties together where we can and keep a single list of commitments.

The Citizen Potawatomi Nation reported on February 28, 2014 that it is the largest employer in Pottawatomie County, with more than 2,200 employees, and that it created 70 percent of Shawnee's net new jobs from 2003 to 2013. A tribal enterprise that operates many businesses has real information technology needs, and a tribal government has its own procurement practices. We ask each owner how it buys, approves and inspects work, and adapt.

A manufacturing county with new industrial ground

A March 10, 2023 magazine article reported that a 45,000-square-foot tribal plant creating 45 new local jobs became the first business tenant of the 700-acre Iron Horse Industrial Park. The same Shawnee prospectus says over 70 manufacturing companies call Shawnee and the surrounding county home and names milling, piping, electrical equipment, films and tube makers among the major employers.

For a data center owner, a manufacturing county offers a workforce familiar with industrial safety and a community used to industrial neighbors. It also means competing demand for electric capacity. A new park such as Iron Horse may have utility infrastructure planned for industrial loads, but a data center load is high and constant, and the provider needs to study it. We discuss utilities and power developers as partners, not as vendors.

Where a mid-sized budget goes

The cost of a fifteen-acre site is dominated by electrical infrastructure. Service entrance equipment, switchgear, generators and batteries make up a large share, followed by the cooling plant and the building shell. Earthwork and paving are smaller, but surprises in the soil can change them quickly. We budget borings early to reduce that risk.

A rail spur is an asset and a cost. If the owner wants to use it, we need to inspect the track, the switch and the unloading area, and confirm who maintains each. If not, we may still need to design around it with setbacks, crossings and drainage. We also hold a contingency line for items that only appear once the ground is open, such as buried utilities or soft areas, and we release it as the work proves out. Our related pages on the Stroud and Chandler corridor and Guthrie give owners other mid-sized options.

What we manage on a mid-sized pad

We manage the earthwork, the mission-critical slab, the equipment pads and the underground duct bank on projects of this size. That gives us close control of the sequence that matters most: the slab and pads must cure and be protected before heavy equipment arrives. Our slab approach appears under mission-critical concrete slabs.

We also coordinate the licensed electrical and mechanical partners who install the gear. Oklahoma does not license general contractors, but it licenses electrical, mechanical and plumbing work, so we verify credentials and inspection history before award. A single schedule links their work to ours so that no trade waits on another. Inspections are booked in advance with the city, and we walk each system with the inspector before the formal visit so that the official inspection is a confirmation rather than a discovery.

Rail, highway and power in one sequence

Delivery planning combines the rail spur, the four-lane highway and I-40. Structural steel and some precast components can arrive by rail, while chillers and switchgear will usually come on trucks. We pick the mode for each item and keep a second route permitted for anything on the critical path.

Interconnection runs in parallel. We start the utility application as soon as the parcel is secured, because the study often takes longer than the shell. Our permitting and utility interconnection service describes the steps. A long study timeline is the most common reason a mid-sized project slips, so we show the owner the utility dates next to the construction dates on one page and revisit them every month.

Considering a Pottawatomie County parcel?

Send us the acreage and the planned load. We will test the layout, ask the utility about capacity and tell you what the site can realistically support.

Common Questions

Is fifteen acres enough for a data center?

For an enterprise or mid-sized colocation building, yes, if the layout is efficient. The building, the generator yard, the cooling plant and the electrical yard must all fit with setbacks. We prepare a block plan on the actual parcel before the owner commits.

What does a rail spur add?

It can receive steel, precast and some heavy equipment without relying on highways. It also needs track inspection, a switch agreement and a place to unload. The Oklahoma Department of Commerce prospectus says a BNSF spur borders the east end of the site.

How does the Shawnee Aligned agreement help a builder?

It pools city and tribal resources for public facilities, fire and police protection, and economic development, according to News 9. For a builder, that suggests coordinated emergency response and infrastructure planning. We still confirm every requirement with each party.

Do tribal owners follow different procurement rules?

They can. Each tribal government sets its own procurement and review process, so we ask early about bidding, approvals and inspections. We do not assume the state's public bidding statute applies.

What is the first step for a Shawnee site?

A block plan and a utility inquiry. Together they tell the owner whether the buildings fit and whether the power can arrive on time. Both can be done before the owner buys land.

Data Center Builders of Oklahoma project planning

Plan Your Oklahoma Data Center Project

Tell us about the site, the power and cooling plan and the schedule, and we will set up a review of scope, schedule, permits and inspections.

Request a Project Review
Call Now405-468-9253